Which license is required for operating a plant with a combined capacity exceeding 500 horsepower?

  1. Second class engineer

  2. First class engineer

  3. Chief engineer

  4. Special engineer's license

The correct answer is: Chief engineer

For operating a plant with a combined capacity exceeding 500 horsepower, a Chief Engineer's license is required. This licensing requirement reflects the complexity and potential safety risks associated with managing higher capacity boilers and pressure vessels. A Chief Engineer is trained to handle significant operational responsibilities, including the safe operation and maintenance of larger systems, understanding advanced boiler technology, and overseeing compliance with safety regulations. The training and expertise associated with a Chief Engineer's license ensure that the individual is proficient in managing not only the day-to-day operations of a high-capacity plant but also capable of responding to emergencies, performing troubleshooting, and implementing preventive maintenance procedures. These skills are critical in safeguarding both the equipment and personnel involved in plant operations. In contrast, the other licenses mentioned—Second Class Engineer, First Class Engineer, and Special Engineer's License—correspond to different levels of training and responsibility, typically aligning with lower horsepower capacities or specific operational contexts. Therefore, they are not suitable for managing a plant of the size indicated in the question.