A first-class engineer may take charge of a boiler plant not to exceed:

  1. 150 horsepower

  2. 600 horsepower

  3. 500 horsepower

  4. 100 horsepower

The correct answer is: 500 horsepower

In the context of Minnesota's regulations regarding boiler operation, a first-class engineer is authorized to oversee a boiler plant with a maximum capacity of 500 horsepower. This designation reflects the competencies and training expected of a first-class engineer, allowing them to handle the complexities and safety requirements of operating such a plant. The horsepower rating is a critical factor because it indicates the thermal energy output and the scale of the boiler system. A first-class engineer has to possess the necessary skills to ensure that the operations remain compliant with safety standards and regulations, as well as to manage the efficiency of the boiler system effectively. The other horsepower limits mentioned do not align with the certification levels in Minnesota's boiler operation classifications, which typically dictate specific thresholds for different classes of engineers. Thus, the limitation for a first-class engineer standing at 500 horsepower highlights their proficiency while ensuring the responsible operation of larger and more complex boiler systems.